Firestop Contractor · Houston, TX

Fire stops here.

Through-penetrations sealed to the tested system. Installations labeled, photographed, and documented.

Scope of Work

What we seal.

Four disciplines. One standard: the listed system, installed exactly.

01 / PENETRATIONS

Through-Penetrations

Pipe, conduit, cable tray, duct, and busway penetrations sealed to the listed system for the exact assembly and rating.

02 / JOINTS

Joints & Perimeter

Head-of-wall, wall-to-wall, and edge-of-slab joints installed for movement, rating, and continuity of the fire barrier.

03 / REMEDIATION

Failed-Inspection Remediation

Deficiencies identified, corrected to a tested system, and re-documented. We take over what others left open.

04 / DOCUMENTATION

Barrier Surveys

Full life-safety barrier surveys with photo records and system schedules, for compliance, sale, or records.

Credentials

Held to the standard.

Certification

Manufacturer-Certified

Factory-trained and certified in firestop systems, products, and installation practice, and certified across the manufacturer lines our projects call for.

Systems

Tested & Listed Only

Installations follow UL and tested-system listings matched to your assembly, selected from the listing that fits the condition rather than a single product line.

Code

IBC 714 Compliant

Penetration protection installed and identified per the International Building Code and local amendments.

Record

Documented Close-Out

Labels, photos, and system schedules delivered on completion. Your inspector gets a full paper trail.

Code & Standards

The code we build to.

Published requirements, cited by section.

NFPA 101

Life Safety Code

§8.3.4 and §8.3.5 govern penetrations and joints in fire barriers. Every opening we close is protected by a tested and listed firestop system or device.

NFPA 101 §8.3.4.2

F & T Ratings

Not less than one hour, and not less than the rating of the barrier penetrated. Horizontal assemblies carry a T-rating. We match the system to the assembly in front of us.

NFPA 1 · NFPA 221

Fire Code & Fire Walls

Fire Code §12.7.8 and NFPA 221 §4.10 carry parallel firestop requirements. Same discipline applies whichever code your AHJ enforces.

ASTM · UL

Test Standards

Penetrations to ASTM E814 / UL 1479. Joints to ASTM E1966 / UL 2079. Perimeter and slab edge to ASTM E2307.

ASTM E2174 · E2393

Special Inspection Ready

High-rises and Risk Category III and IV buildings draw third-party inspection. Our work and records are built to hold up under it, including destructive verification.

IBC

Building Code

§714 penetrations, §715 joints, §1705.18 special inspections, plus Houston and Harris County amendments.

Process

How it runs.

  1. Survey

    Walk the barriers, count and classify every penetration and joint, confirm assembly ratings.

  2. Submittals

    Listed system selected for each condition. Submittal package issued before work begins.

  3. Install

    Sealed to the system detail. Clean work, on schedule, coordinated with your trades.

  4. Label & Document

    Seals labeled and photographed. Close-out package delivered for inspection.

Our Commitments

What we put in writing.

How we work.

Systems

Tested and Listed, or We Stop

We install to a tested and listed system. If field conditions don't match one, work pauses until the manufacturer or a licensed engineer issues the judgment.

Certification

Certified Installers

Installation is led by personnel carrying current manufacturer firestop certification for the systems on your job.

Close-Out

Documented Work

Labeled seals, a photo record, and a system schedule at completion. The paperwork is part of the job.

Contact

Request a survey.

Tell us about the barriers. The more we know before the walk, the faster you get a number.

Response within one business day.

You hear back from the installer.